Time

9:30am - 12:15pm

Venue

HPC Cannington Park and Ride, Cannington, Bridgwater, Somerset TA5 2JA United Kingdom

Cost

Free to attend

Event description

The CIWEM South Western branch invites you to a sealed tour of Hinkley Point C nuclear power station.

Hinkley Point C (HPC) in Somerset is the first new nuclear power station to be built in the UK in over 20 years. It is one of the largest and most complex projects in Europe and will take 10 years to complete. Construction started in 2016, and there are currently over 4,500 workers on site.

The UK EPR being constructed at Hinkley Point C, is a type of Pressurised Water Reactor (PWR). The design of the UK EPR’s that will be built at HPC represents a major development on previous pressurised water reactors, making them amongst the safest and most efficient civil nuclear power generators ever designed. The design basis for HPC ensures that the proposed plant is secure against natural hazards that have a frequency of less than one in 10,000 years. These hazards include tides, storm surges and tsunami as isolated and in-combination events. The planned twin unit UK EPR is capable of generating 3,260MW of secure, low carbon electricity for 60 years for around 6 million homes.

In addition to the tour there will be a presentation given by Phil Kruse, Environmental Technical Manager, followed by a Q&A session.

Please see the itinerary for full details.

Arrangements on arrival

The site visit will start at the HPC Cannington Park & Ride facility in Cannington, near Bridgwater, Somerset, TA5 2JA. HPC Cannington Park & Ride will be used as our base, and all CIWEM South Western Branch delegates will be taken to and from the HPC construction site from here via EDF’s own coach during the Hinkley Point C Sealed Site Tour. Please note that it will not be permitted to drive to the HPC site directly, as entry will automatically be denied on arrival.

We will meet at the HPC Cannington park and ride facility in Cannington, near Bridgwater. HPC Cannington park and ride will be used as our base and all CIWEM South Western branch delegates will be taken to and from the HPC construction site from here via EDF's own coach during the site tour of Hinkley Point C. Please note that it will not be permitted to drive to the construction site directly, as entry will automatically be denied.

Book now

Booking information

Please note that places are strictly limited to 50 delegates and bookings are accepted on a first come, first served basis.

The deadline for booking your place is Friday 14 February 2020 at 17:00.

Bookings must be made through 'My CIWEM' using the above booking link and are only confirmed once you have clicked ‘proceed & submit’ in the cart and received a confirmation email. Should you be unable to attend the event after booking on, please cancel to allow other delegates to take the place.

Please contact barbara.woods@ciwem.org if you have any difficulties with booking a place or would like to cancel your attendance.

Security checks

Due to the strict health, safety and security checks process for those visiting the site, EDF Energy HPC will be undertaking security checks in advance of the visit and on the day. You will have to provide photographic ID on the day and personal information that match the details in your ID. It is important that you carefully read the EDF Energy HPC health, safety and security terms and conditions that apply to tours of the site along with their privacy policy before you book your place.

We will require you to provide the additional information for the EDF Energy HPC Visitor Security Details online forms, so it is essential for you to accurately complete the six security check information questions when booking.

The name details entered for the visitor when attending Hinkley Point C must consist of your full name and must accurately match those on the ID document presented (for example: Joseph Bloggs NOT Jo Bloggs). Failure to comply with this will prevent the visitor being permitted access under the request.

Please highlight anyone that has a HPC site pass. Please note: It is the responsibility of the HPC team member to ensure this is live (been onsite in the last 30 days) - if they fail to do so they will be refused entry as part of the sealed tour visit.

View the EDF Energy HPC health, safety and security terms and conditions and their privacy policy.


Travelling to the venue

The site visit will start at the HPC Cannington Park & Ride facility in Cannington, near Bridgwater, Somerset, TA5 2JA. HPC Cannington Park & Ride will be used as our base, and all CIWEM SW Branch delegates will be taken to and from the HPC construction site from here via EDF’s own coach during the Hinkley Point C Sealed Site Tour. Please note that it will not be permitted to drive to the HPC site directly, as entry will automatically be denied on arrival.

As part of CIWEM’s commitment to tackling the climate and ecological emergency we would encourage delegates to use the most sustainable means of transport possible.

If you do come by car to the HPC Cannington Park and Ride facility, please do consider sharing your journey with others.

Kindly supported by...

Sponsor Events

With your business at the forefront of our minds, we offer a wide variety of sponsorship opportunities designed to raise your profile with CIWEM’s portfolio of events

Find out more

Industry events

CIWEM supports a wide range of industry events that are of interest and benefit to our Members.

Find out more

Events archive

Missed an event?

Find out more